L.p. Client  Name Date of completion
1 Babcook Borsig Steinmuller Disassembly and assembly of leakproof walls of C1/C2 boiling tubes, replacement of LUVO heating packs, replacement of P1B steam superheater piping and steel structure of boiler 3 hot bands in Bełchatów Power Plant <2010
2 BOT Elektrownia Opole Modernization of BP-1150 boiler pressure system of units no. 2,3,4 in Opole Power Plant <2010
3 Anwil SA Execution and replacement of OHO MR-101 reactor distribution system on vinyl chloride plant <2010
4 ZE PAK SA Construction of the lignite crushing system at Pątnów Power Plant <2010
5 ZE PAK SA Execution of two heavy repairs and 4 middle repairs of OP-650b boilers in Pątnów Power Plant <2010
6 Babcock Noell Assembly of two absorbers and slop tank of flue gas desulphurization installation of A and B unit in Moorurg power plant 2010
7 ZE PAK SA Modernization of TK200, TK120, TK50 7CK60 TG sets in ZE PAK Power Plants  2010
8 ZE PAK SA Execution of one heavy repair, 1 middle repair of OP-650b boilers and ongoing repairs of power engineering and auxiliary equipment in Pątnów Power Plant 2011
9 ZE PAK SA Modernization of TK200, TK120, TK50, 26K470, 13K215, V50Z, 7CK60 TG sets in ZE PAK Power Plants 2011
11 ZE PAK SA Execution of diagnostic tests during modernizing and service repairs of ZE PAK Power Plant units  2011
12 Remak SA Mechanical installation of CFB 154MWt biomass boiler in Konin Power Plant 2011
13 SAVEX SA Unit 5 Cooling Tower modernization in Adamów Power Plant – anti frosting/ anti icing system installation 2011
14 Babcock Borsig Steinmuller Repair works of unit C secondary superheater in Janschwalde Pawer Plant 2011
15 ELEKTROWNIA PĄTNÓW II
Sp. z o.o.
Fabrication of 720 pcs of beaters (with hard-wearing layer) for unit 9 mills in Pątnów Power Plant 2012
16 ZE PAK SA Construction for unloading, storage and transport of heating oil systems for K12 biomass boiler and K-4-K8 boilers in Konin Power Plant 2012
17 ZE PAK SA Replacement of unit 3 and 4 cooling water pumps with fittings in Central Pumping House in Konin Power Plant 2012
18 ZE PAK SA Modernization of TK200, TK120, TK50, 7CK60, 26K470, 13K215 TG sets in ZE PAK Power Plants 2012
19 Babcock Borsig Steinmuller Modernization of boiler no. 7 and 8 in Bełchatów Power Plant – replacement the pipelines into ECO ones and superheater PI B 2012
20 Remak Rozruch SA Modernization of OP-650b K5 boiler to reduce NOx emission in Pątnów Power Plant  2012
21 TurboCare
Poland SA
Revitalization of TG-6 turbine in Konin Power Plant 2012
22 ZE PAK SA Execution of four middle repairs, of OP-650b boilers and repairs of power engineering and auxiliary equipment in Pątnów Power Plant 2014
23 ZE PAK SA Modernization of TK200, TK120, TK50, 7CK60, 26K470, 13K215 i V50Z TG sets 2014
24 ZE PAK SA Construction for unloading, storage and transport of heating oil systems in Pątnów power plant  2015
25 Babcock Borsig Steinmuller Repair of 4  LUVO rotary air preheater of unit C in Janschwalde Power Plant 2015
26 Babcock Borsig Steinmuller Modernization of P1B superheater and ECO modernization, unit 9 and 10 in Bełchatów Power Plant 2016
27 Mostostal Power Development Installation of unit 5 high-pressure pipelines – sets 3 and 4  2017

Prefabrication of pressure components and steel structures

L.p. Client Name Date of completion
1 SNC LAVALIN Polska Sp. z o.o. Execution of steel structure of G3 social building in Pątnów II Power Plant, A7, A8, A9 buildings foundations in Pątnów II Power Plant <2010
2 Nowa Dolina Nidy Sp. z o.o. Execution and assembly of steel structure of twelve Φ5400 storage silos  <2010
3 Babcock Noell GmbH Workshop execution of flue gas duct walls of clad plates for R unit in Boxberg Power Plant, execution of assembly documentation, delivery and installation of the flue gas desulphurization system of unit R in Boxberg Power Plant <2010
4 ZE PAK SA Execution and delivery of boiler pressure elements for Pątnów Power Plant <2010
5 Babcock Noell GmbH Prefabrication of absorbers and slop tank of flue gas desulphurization installation of A and B unit in Moorburg power plant 2010
6 Foster Wheeler Energia Polska SA Prefabrication and delivery of suspension rods for CFB 154 MWt boiler in Konin Power Plant 2010
7 Foster Wheeler Energia Polska SA Prefabrication and delivery of air and flue gas duct fo CFB 154MWt biomass boiler in Konin Power Plant 2011
8 ZE PAK SA Prefabrication and delivery of water preheater for OP-650b boiler (unit 1 and 2) in Pątnów Power Plant 2014
9 ZE PAK SA Prefabrication and delivery of steam preheater for OP-650b boiler (unit 1 and 2) in Pątnów Power Plant 2014

Lines and power stations

L.p. Client Name Date of completion
1 ALSTOM Construction of „Zegrze” power station in Poznań (110kV GIS switchgear) 2011
2 TAURON Expansion of „Huta Skawina” 110/15kV Power Station in Skawina 2012
3 ENEA Reconstruction of “Mirosławiec” HV/MV Power Station 2012
4 TAURON Construction of “Ustronie” Power station (110kV GIS switchgear) – consortium with ALSTOM 2014
5 ALSTOM Construction of 110kV power station for KGHM – Głogów Copper Refinery (ALSTOM 110kV GIS switchgear) 2015
6 PAK KWB Konin Execution of 15kV and 30KV overhead power lines 2015
7 PGE Exchange of 10 earth-fault current compensation systems of 110/15 kV power stations in PGE Warsaw 2015
8 ENERGA Exchange of 4 earth-fault current compensation systems of Malbork Południe and Malbork Rakowiec power stations  2016
9 PSE S.A. Expansion of 110kv switching station in Adamów 220/110kV power station to connect the technical gases factory 2016
10 MP Production
Sp. z o.o.
Construction of 110/6 kV switching station – supply of technical gases factory (Messer) 2016

Electrial systems and installations, automation

L.p. Client Name Date of completion
1 ZE PAK Modernization of automation system and delivery of DCS for 4 120 MW units in Adamów Power Station < 2011
2 ZE PAK, Siemens, Alstom,
SNC Lavalin, Rafako
Electrical and automation assembly works under constructing of 464 MW unit in “Pątnów II” Power Plant   < 2011
3 ZE PAK Delivery and assembly of electrical and automation systems (incl. DCS) of cooling water pump station in Pątnów Power Plant < 2011
4 EMERSON Software and system startup for DCS Ovation system for Novaky Heat and power generating plant < 2011
5 CONDIX Design, delivery and assembly of electrical, automation and IT systems for storage and transport installation of biomass in Konin Power Plant 2012
6 RAFAKO Design, delivery, assembly and commissioning of automation systems for unit 5 and 6 flue gas desulphurisation installation in PGE in Dolna Odra Power Plant  2012
7 RAFAKO Automation system of rotary air preheater knot of 800MW unit in BOT Power Plants (Bełchatów) 2012
8 TURBOCARE, FOSTER –WHEELER Exchange of electrical and automation systems (incl. DCS) of TG-6 turboset, assembly of electrical and automation systems for K-12 boiler 2012
9 ALSTOM Construction of 110kV power station for KGHM – Głogów copper Refinery (ALSTOM 110kV GIS switchgear) 2015
10 ZE PAK,
Ethos Energy,
SBB Energy
Complex modernization of electrical and automation system of unit 1 and 2 in Pątnów Power Plant (incl. exchange of DCS) 2016